Designing the System
Zilla Corporation offers expert engineering services to ensure correct design configurations and optimal installation procedures. Fill out our Zilla® Submittal Form to submit your project.
The procedure to determine Design Wind Load is specified by the American Society of Civil Engineers and referenced in the International Building Code 2006. This manual is a general guideline for the installation of Zilla® Rac.
Installer's Responsibilities
The installer is fully responsible for getting the system verified and approved for all local and state building
codes and all Authorities Having Jurisdiction (AHJ). Zilla Corporation assumes no liability whether assumed
or implied.
Please read all instructions carefully before installing Zilla® and NEX® products. The design and installation
of the Zilla® and NEX® product lines should comply with all building codes and regulations. Improper installation
of Zilla® products, beyond how they were designed, may result in the product warranty being nullified.
A packing slip is included with each system, take time to familiarize yourself with this list and its components
before starting any installation. Should any parts be missing or damaged, contact your local Zilla® vendor
for replacement as soon as possible.